FIELD EXPERIENCE · TECHNICAL LEADERSHIP · PROJECT DELIVERY · DIGITALISATION

41.1536° N / 24.1474° E
SOLAR INFRASTRUCTURE / EU

THEODOROSMALEAS

17+YEARS
BUILDING SOLAR POWER

FROM FIELD EXPERIENCE
TO DIGITALISATION

SCROLL TO ENTER ↓

01 / EXPERIENCE

1.8+GWCONSTRUCTION & PROJECT EXPERIENCE

FROM THE FIELD
TO TECHNICAL MANAGEMENT.

2.2 GWO&M PORTFOLIO SUPERVISED · UKINTERNATIONALPROJECT EXPERIENCE · 7 COUNTRIES

Nearly two decades where solar plants are truly made — in the field, across construction interfaces, under real delivery pressure. That experience is now moving toward technical management, construction management and digitalisation.

02 / EVOLUTION

ONE CAREER.
SIX STAGES.

CAREER SPAN20072026

The same discipline, applied at a different altitude each time — from the ground up.

  • FIELD
  • ELECTRICAL EXECUTION
  • SUPERVISION
  • CONSTRUCTION
  • SITE MANAGEMENT
  • TECHNICAL ADVISORY / MANAGEMENT
CHAPTER 01/ 07
FIELD

Elias Karagiannis

Electrician → Operator → Foreman

2007–2017Greece + international sites

A decade on the tools. Electrical installation work in Greece and on international sites, advancing from electrician to operator to foreman — the ground layer everything after it is built on.

RESPONSIBILITY
  1. FIELD
  2. ENGINEERING
  3. MANAGEMENT
  4. ADVISORY
Aerial view of the Oriana I & Oriana II solar plant near Isabela, Puerto Rico, near the coastAerial view of the Burnoye 2 50 MW solar plant in Kazakhstan surrounded by farmlandAerial view of the Wiggin solar plant in the United Kingdom among green fieldsAerial view of a 5.5 MWp solar plant in Cyprus in a hillside valleyAerial view of the Skovgaard Energy hybrid solar and wind plant in Denmark, with wind turbines among rows of PV modules
17PROJECTS DELIVERED ON SCHEDULE
40MWpSKOPOS SOLAR · FLORINA, GREECE
FIELD RECORDORIANA I & II · PUERTO RICO · 60 MW
COMPANY
Elias Karagiannis Technical & Electrical Installations
LOCATION
Greece + international sites
PERIOD
2007–2017
RESPONSIBILITY
FIELD
DISCIPLINE
ELECTRICAL INSTALLATION · FIELD EXECUTION

SELECTED PROJECT

  • Oriana I & Oriana II60 MW total · 2016 · Construction Foreman, KKM
01 / 07FIELD2007–2017

Elias Karagiannis

Electrician → Operator → Foreman — Greece + international sites

Aerial view of the Oriana I & Oriana II solar plant near Isabela, Puerto Rico, near the coastORIANA I & II · PUERTO RICO · 60 MW

A decade on the tools. Electrical installation work in Greece and on international sites, advancing from electrician to operator to foreman — the ground layer everything after it is built on.

ELECTRICAL INSTALLATION · FIELD EXECUTION

  • Oriana I & Oriana II60 MW total · 2016 · Construction Foreman, KKM
02 / 07ENGINEERING2017

Metka EGN

Technical Supervisor — Kazakhstan

Aerial view of the Burnoye 2 50 MW solar plant in Kazakhstan surrounded by farmlandBURNOYE 2 · KAZAKHSTAN · 50 MW

Technical supervision on a 50 MW plant in Kazakhstan, where delivery depended on training local contractor teams in PV-specific construction methods under demanding site and weather conditions.

TECHNICAL SUPERVISION · KNOWLEDGE TRANSFER

50MWPLANT CAPACITY

  • Burnoye 250 MW · 2017 · Technical Supervisor, Metka EGN
03 / 07ENGINEERING2017–2018

Geometris Ltd

Electrical Engineer / O&M Supervisor — United Kingdom

Aerial view of the Wiggin solar plant in the United Kingdom among green fieldsWIGGIN · UNITED KINGDOM · 11.5 MWp

From building plants to keeping them producing: electrical engineering and O&M supervision across a UK solar portfolio, where performance — not construction progress — is the measure.

ELECTRICAL ENGINEERING · O&M SUPERVISION

2.2GWO&M PORTFOLIO SUPERVISED · UK

04 / 07MANAGEMENT2020–2022

Raggio Solare

Construction Manager — Greece / Cyprus

Aerial view of a 5.5 MWp solar plant in Cyprus in a hillside valleyCYPRUS · 5.5 MWp

Construction management as Raggio Solare moved into electrical works at a significantly larger PV scale — construction schedules, direct client communication and the electrical crews, all owned.

CONSTRUCTION MANAGEMENT · SCHEDULING · CLIENT INTERFACE

05 / 07MANAGEMENT2022–2023

Sunel Group

Site Manager → Electrical Inspector — Greece / Denmark

Aerial view of the Skovgaard Energy hybrid solar and wind plant in Denmark, with wind turbines among rows of PV modulesSKOVGAARD ENERGY · DENMARK · 48 MW

Two roles, two countries. Site management on a 48 MW hybrid solar, wind and Power-to-X development in Denmark — guiding two subcontractors through their first PV build — then electrical inspection on a 100 MWp project in Greece.

SITE MANAGEMENT · ELECTRICAL INSPECTION

  • Skovgaard Energy Hybrid PV + Power-to-X48 MW solar · 2022 · Site Manager, Sunel
  • Delfini Solar Project100 MWp · 2023 · Electrical Inspector, Sunel
06 / 07MANAGEMENT2023–2025

Metlen

Site Manager — Greece

17PROJECTS DELIVERED ON SCHEDULE

Seventeen individual PV projects run as one programme. Construction schedules developed and managed across the whole portfolio, progress monitored on every site — all seventeen delivered to their planned schedules.

PORTFOLIO MANAGEMENT · CONSTRUCTION PLANNING

  • Metlen Multi-Site PV Portfolio2024 · Site Manager, Metlen Energy & Metals
07 / 07ADVISORY2026

Resinvest

Technical Advisor — Greece

40MWpSKOPOS SOLAR · FLORINA, GREECE

Technical advisory on a 40 MWp construction programme in Florina — building the QA/QC plan and the reporting framework the construction is controlled, submitted and approved through.

TECHNICAL ADVISORY · QA/QC · PROJECT CONTROLS

02.2 / SIX STAGES

The progression behind the chronology — each stage built on the one beneath it, never replacing it. Every line names the verified role that evidences it.

  1. 01

    Field

    Electrician, operator and foreman on site from 2007; Construction Foreman on Oriana I & II, Puerto Rico (2016).

    EVIDENCED IN
  2. 02

    Electrical Execution

    Electrical Engineer / O&M Supervisor in the UK (2017–2018); Electrical Inspector on Delfini, 100 MWp (2023).

    EVIDENCED IN
  3. 03

    Supervision

    Technical Supervisor on Burnoye 2, Kazakhstan (2017) — training local contractor teams in PV construction methods.

    EVIDENCED IN
  4. 04

    Construction

    Construction Manager at Raggio Solare (2020–2022) — schedules, client interface and electrical crews at a larger PV scale.

    EVIDENCED IN
  5. 05

    Site Management

    Site Manager on the Skovgaard hybrid PV site, Denmark (2022) and across the 17-project Metlen portfolio (2023–2025).

    EVIDENCED IN
  6. 06

    Technical Advisory / Management

    Technical Advisor on Skopos, 40 MWp, Florina (2026) — QA/QC, reporting, HSE coordination and project controls.

    EVIDENCED IN

03 / INTERNATIONAL DELIVERY

PROJECT
EXPERIENCE.

Utility-scale solar. International delivery.
Field-led engineering.

7CASE STUDIES4COUNTRIES2016–2026DELIVERY PERIOD

SELECTED PROJECTS / CASE STUDIES

CAPACITY
60 MW total
LOCATION
Puerto Rico
YEAR
2016
ROLE
Construction Foreman
Aerial view of the Oriana I & Oriana II solar plant near Isabela, Puerto Rico, near the coast

Oriana I & Oriana II

BRIDGING THE COMMUNICATION GAP.

Coordinating local construction teams across two utility-scale PV projects where communication itself became a critical part of project delivery.

KKM · Utility-Scale Solar
CAPACITY
50 MW
LOCATION
Kazakhstan
YEAR
2017
ROLE
Technical Supervisor
Aerial view of the Burnoye 2 50 MW solar plant in Kazakhstan surrounded by farmland

Burnoye 2

BUILDING THE TEAM THAT BUILT THE PLANT.

Training local contractor teams to execute and complete a 50 MW plant under demanding site conditions.

Metka EGN · Utility-Scale Solar
LOCATION
Greece
YEAR
2019–2020
ROLE
Construction Manager
Collage of twelve aerial photographs of ground-mounted PV installations on farmland and hillsides in Greece

Raggio Solare — Electrical Construction Scale-Up

SCALING ELECTRICAL CONSTRUCTION.

Taking on construction scheduling and client communication as Raggio Solare moved into electrical works at a larger PV construction scale.

Raggio Solare · Electrical Construction
CAPACITY
48 MW solar
LOCATION
Denmark
YEAR
2022
ROLE
Site Manager
Aerial view of the Skovgaard Energy hybrid solar and wind plant in Denmark, with wind turbines among rows of PV modules

Skovgaard Energy Hybrid PV + Power-to-X

LEADING FIRST-TIME PV TEAMS.

Guiding two subcontractors through their first photovoltaic construction on a hybrid solar, wind and Power-to-X development.

Sunel · Hybrid PV + Wind / Power-to-X
CAPACITY
100 MWp
LOCATION
Greece
YEAR
2023
ROLE
Electrical Inspector
Hillside view of the Delfini solar project site in Greece, PV arrays laid out across graded plateaus below a mountain ridge

Delfini Solar Project

WHEN THE SITE CHANGES THE DESIGN.

Supporting an alternative cable-routing solution where conventional trenching wasn't feasible on a 100 MWp site.

Sunel · Utility-Scale Solar
LOCATION
Greece
YEAR
2024
ROLE
Site Manager
Gravel access road and an open cable trench under construction across a PV site in Greece, graded terraces on the hillside behind

Metlen Multi-Site PV Portfolio

17 PROJECTS. ONE PROGRAMME. DELIVERED ON SCHEDULE.

Planning and managing construction schedules across a 17-project PV portfolio, including Megalo Monastiri A & B — delivered on schedule.

Metlen Energy & Metals · Multi-Site PV Portfolio
CAPACITY
40 MWp
LOCATION
Florina, Greece
YEAR
2026
ROLE
Technical Advisor
40 MWpCAPACITY

Skopos Solar Project

BUILDING THE SYSTEM BEHIND THE CONSTRUCTION.

Contributing to the QA/QC plan and reporting framework behind a 40 MWp construction programme.

Resinvest · Utility-Scale Solar

PROJECT ARCHIVE

PROJECTCOUNTRYCAPACITY
M-Kat GrinKazakhstan100 MW
Complexo Solar PiraporaBrazil400 MW
8SITES PHOTOGRAPHED5COUNTRIES283+MWp IN PROJECT PHOTOGRAPHY
01 of 08
Aerial view of the M-Kat 100 MWp utility-scale solar plant in Kazakhstan under snow/01100 MWp
Kazakhstan

M-Kat

CAPACITY100 MWpTYPEUTILITY-SCALE SOLARSOURCEPROJECT PORTFOLIO
Aerial view of the Oriana 1-2 solar plant near Isabela, Puerto Rico, near the coast/0260 MWp
Puerto Rico

Oriana 1–2

CAPACITY60 MWpTYPEUTILITY-SCALE SOLARSOURCEPROJECT PORTFOLIO
Aerial view of the Burnoye 50 MWp solar plant in Kazakhstan surrounded by farmland/0350 MWp
Kazakhstan

Burnoye

CAPACITY50 MWpTYPEUTILITY-SCALE SOLARSOURCEPROJECT PORTFOLIO
Aerial view of the Skovgaard Energy hybrid solar and wind plant in Denmark, with wind turbines among rows of PV modules/0448 MWp
Denmark

Skovgaard Energy

CAPACITY48 MWpTYPEUTILITY-SCALE SOLARSOURCEPROJECT PORTFOLIO
Aerial view of the Wiggin solar plant in the United Kingdom among green fields/0511.5 MWp
United Kingdom

Wiggin

CAPACITY11.5 MWpTYPEUTILITY-SCALE SOLARSOURCEPROJECT PORTFOLIO
Aerial view of a 5.5 MWp solar plant in Cyprus in a hillside valley/065.5 MWp
Cyprus

Cyprus

CAPACITY5.5 MWpTYPEUTILITY-SCALE SOLARSOURCEPROJECT PORTFOLIO
Aerial view of a 5 MWp solar plant in Cyprus/075 MWp
Cyprus

Cyprus

CAPACITY5 MWpTYPEUTILITY-SCALE SOLARSOURCEPROJECT PORTFOLIO
Aerial view of a 3 MWp solar plant in Cyprus surrounded by farmland/083 MWp
Cyprus

Cyprus

CAPACITY3 MWpTYPEUTILITY-SCALE SOLARSOURCEPROJECT PORTFOLIO

04 / CONSTRUCTION DNA

BUILT IN
THE FIELD.

REAL PROJECTS / REAL SITES / REAL CONSTRUCTION

Field execution and crew coordination at the point of installation.

PROVEN ONConstruction ForemanKKM · Oriana I & Oriana II · 60 MW total · 2016
01FIELD
Excavators grading and clearing a utility-scale solar site in Kazakhstan under a dramatic sky
KAZAKHSTAN

Field Preparation & Survey

Every project starts with the ground.

Backhoe excavator grading ground on a solar site in Kazakhstan at duskExcavator working beside long rows of freshly driven piles stretching to the horizon in Kazakhstan
02STRUCTURE
Rows of concrete pile footings laid out on a solar construction site in Cyprus, with a piling rig at work
CYPRUS

Structural Execution

Accuracy becomes infrastructure.

Rows of assembled mounting structure ready to receive modules on a solar site in CyprusWorkers installing torque tubes on mounting structure at a solar site in Kazakhstan
03ELECTRICAL
DC cable trench with conduits routed across a solar construction site in Cyprus
CYPRUS

Electrical Infrastructure

Thousands of connections. One integrated system.

Wide cable trench with reels of cable beside a partially completed array in CyprusCoiled earthing cable beside an open duct trench on a solar site in Cyprus
04COMPLETION
Aerial view of a completed hybrid solar and wind energy site in Denmark, with wind turbines among rows of PV modules
DENMARK

Completed & Operational

From construction to operation.

Aerial view of a completed utility-scale solar array in Kazakhstan surrounded by farmlandAerial view of a completed solar array in the United Kingdom among green and yellow agricultural fields

04.2 / THE METHOD — SIX DISCIPLINES

Twenty-two systems under the six disciplines of the method, and the build stages each discipline acts in. Every discipline is evidenced only by a role actually held on a real project — the evidence is shown as it is, unequal where it is unequal.

  1. 01

    Mechanical

    Piling, structures and module installation — the physical plant put in the ground and on the tables.

    • 01 FIELD —
    • 02 STRUCTURE
    • 03 ELECTRICAL —
    • 04 COMPLETION —

    SYSTEMSPILING · STRUCTURES · MODULES

    2 verified roles
    • Construction ForemanKKM · Oriana I & Oriana II · 60 MW total · 2016
    • Electrician → Operator → ForemanElias Karagiannis Technical & Electrical Installations · Greece + international sites · 2007–2017
  2. 02

    Electrical

    From DC cabling to LV, MV/HV, earthing, inverters, substations and the grid connection — installed and inspected on real ground.

    • 01 FIELD —
    • 02 STRUCTURE —
    • 03 ELECTRICAL
    • 04 COMPLETION —

    SYSTEMSDC CABLING · LV SYSTEMS · MV / HV INFRASTRUCTURE · GRID CONNECTION · EARTHING · INVERTERS · SUBSTATIONS

    2 verified roles
    • Electrical InspectorSunel · Delfini Solar Project · 100 MWp · 2023
    • Electrical Engineer / O&M SupervisorGeometris Ltd · United Kingdom · 2017–2018
  3. 03

    QA/QC

    Quality plans, checks, records and technical reporting that let construction be approved rather than argued about.

    • 01 FIELD
    • 02 STRUCTURE
    • 03 ELECTRICAL
    • 04 COMPLETION

    SYSTEMSQA / QC · TECHNICAL REPORTING

    1 verified role
    • Technical AdvisorResinvest · Skopos Solar Project · 40 MWp · 2026
  4. 04

    HSE

    Health, safety and environment coordination on site.

    • 01 FIELD
    • 02 STRUCTURE
    • 03 ELECTRICAL
    • 04 COMPLETION

    SYSTEMSHSE

    1 verified role
    • Technical AdvisorResinvest · Skopos Solar Project · 40 MWp · 2026
  5. 05

    Commissioning

    Testing, commissioning, troubleshooting and the O&M and performance-monitoring work after handover.

    • 01 FIELD —
    • 02 STRUCTURE —
    • 03 ELECTRICAL —
    • 04 COMPLETION

    SYSTEMSTESTING · COMMISSIONING · TROUBLESHOOTING · O&M · PERFORMANCE MONITORING

    1 verified role
    • Electrical Engineer / O&M SupervisorGeometris Ltd · O&M portfolio supervised · UK · 2.2 GW · 2017–2018
  6. 06

    Management

    Site supervision, construction management, contractor coordination and planning — held together until the plant is finished on time.

    • 01 FIELD
    • 02 STRUCTURE
    • 03 ELECTRICAL
    • 04 COMPLETION

    SYSTEMSSITE SUPERVISION · CONSTRUCTION MANAGEMENT · CONTRACTOR COORDINATION · PLANNING

    4 verified roles
    • Site ManagerMetlen Energy & Metals · Multi-Site PV Portfolio · 17 projects delivered on schedule · 2024
    • Site ManagerSunel · Skovgaard Energy Hybrid PV + Power-to-X · 48 MW solar · 2022
    • Construction ManagerRaggio Solare · Greece / Cyprus · 2020–2022
    • Technical SupervisorMetka EGN · Burnoye 2 · 50 MW · 2017

05 / ENGINEERING TOOLS

ENGINEERING TOOLS
BUILT FROM FIELD EXPERIENCE.

Practical calculation tools for photovoltaic construction,
electrical engineering and project planning.

FIELD EXPERIENCEENGINEERING LOGICCALCULATIONCONSTRUCTION-READY OUTPUT

Each instrument below solves a problem that actually stops work on site — a string that will not start on a cold morning, a cable run that loses too much, a crew count that cannot meet the date.

INSTRUMENTS

01/ 05

PLANNED FOR V2

  • AC Cable Calculator
  • Energy Yield Tools
  • Earthing Tools
EXAMPLE RUNExample inputs — not project data
VALID WINDOW17–27modulesRESULT: VALID
ENGINE OUTPUT
STRING Voc · COLD
1 420VVALIDlimit 1 500 V
STRING Vmp · HOT
923VVALIDMPPT window 600–1 500 V
STRING CURRENT
13.1AVALID≤ 30 A
STRING POWER
14.3kWp
VALID WINDOW
17–27modules
INPUTS
MODULE
550 W · Voc 49.9 V · Vmp 41.9 V
TEMP. COEFFICIENTS Voc / Vmp
-0.27 / -0.34%/°C
INVERTER
1500 V · MPPT 600–1500 V
DESIGN TEMPERATURES MIN / MAX
-10 / 70°C
MODULES PER STRING
26

INSTRUMENT 01

PV String Designer

PURPOSE

Size a PV string so it stays inside the inverter's electrical limits at real site temperatures.

WHAT IT CHECKS
  • Maximum DC voltage at the coldest design temperature
  • MPPT operating window at both temperature extremes
  • String current against inverter input limits
AVAILABLELEARN MORE / FULL TOOL ↗

CALCULATE

01AVAILABLE

PV String Designer

Size a PV string so it stays inside the inverter's electrical limits at real site temperatures.

EXAMPLE RUNExample inputs — not project data
VALID WINDOW17–27modulesRESULT: VALID
ENGINE OUTPUT
STRING Voc · COLD
1 420VVALIDlimit 1 500 V
STRING Vmp · HOT
923VVALIDMPPT window 600–1 500 V
STRING CURRENT
13.1AVALID≤ 30 A
STRING POWER
14.3kWp
VALID WINDOW
17–27modules
INPUTS
MODULE
550 W · Voc 49.9 V · Vmp 41.9 V
TEMP. COEFFICIENTS Voc / Vmp
-0.27 / -0.34%/°C
INVERTER
1500 V · MPPT 600–1500 V
DESIGN TEMPERATURES MIN / MAX
-10 / 70°C
MODULES PER STRING
26
02AVAILABLE

PV Construction Planner

Turn a target DC capacity into construction quantities, crew requirements and working days.

EXAMPLE RUNExample inputs — not project data
ACTIVITY DURATION14working daysRESULT: WARNING
ENGINE OUTPUT
MODULES
18 200
STRINGS
700
TABLES
350
PILES
2 100
ACTUAL DC CAPACITY
10.01MWp
ACTIVITY DURATION
14working daysWARNING2.3 calendar weeks · 6-day week
CREWS FOR TARGET
4crews3 planned
INPUTS
TARGET DC CAPACITY
10MWp
MODULE & LAYOUT
550 W · 26 per string · 52 per table
ACTIVITY
2 400 piles · 60 per crew per day · 3 crews
TARGET DURATION
12working days
03AVAILABLE

DC Cable / Voltage Drop

Check a DC cable run for voltage drop and conductor loss before it is installed.

EXAMPLE RUNExample inputs — not project data
DROP vs DESIGN TARGET1.46%RESULT: VALID
ENGINE OUTPUT
LOOP RESISTANCE
1.215Ω
VOLTAGE DROP
15.9V
DROP vs DESIGN TARGET
1.46%VALIDdesign target 1.5 %
POWER LOSS
209W1.46 % of transmitted power
EFFICIENCY
98.54%
MINIMUM CABLE SIZE
6mm²smallest standard size that meets the target
INPUTS
DC CURRENT
13.1A
SYSTEM VOLTAGE
1 090V
ROUTE
180 m one-way · 6 mm² Cu · 60 °C
DESIGN TARGET
1.5%
04AVAILABLE

Inverter Loading

Evaluate how heavily an inverter is loaded by the DC array behind it.

EXAMPLE RUNExample inputs — not project data
DC/AC RATIO1.16RESULT: VALID
ENGINE OUTPUT
DC CAPACITY
2 574kWp
AC CAPACITY
2 220kW
DC/AC RATIO
1.16MODERATE DC OVERSIZING
DC PER INVERTER
214.5kWVALID≤ 280 kW
MODULES PER INVERTER
390moduleseven distribution
INPUTS
ARRAY
4 680 × 550 W
INVERTERS
12 × 185 kW
MAX DC INPUT
280kW / inverter
05AVAILABLE

BESS Sizing

Size a battery system by power and by energy — two requirements that are never the same number.

EXAMPLE RUNExample inputs — not project data
DESIGN NOMINAL ENERGY25.36MWhRESULT: VALID
ENGINE OUTPUT
REQUIRED ENERGY
20.0MWh
BATTERY-SIDE USABLE
21.74MWh
NOMINAL BEFORE RESERVE
24.15MWh
DESIGN NOMINAL ENERGY
25.36MWh
C-RATE
0.39C2.54 h energy-to-power
INPUTS
POWER × DURATION
10 MW × 2 h
ENERGY BASIS
AC delivery point
EFFICIENCY / DoD / RESERVE
92 / 90 / 5%

PLANNED FOR V2

  • AC Cable Calculator
  • Energy Yield Tools
  • Earthing Tools
Read the engineering guides behind these tools — Knowledge Hub ↗

ENGINEERING DESK

NEED SUPPORT ON A REAL PROJECT?

Turn project information into structured,
construction-ready technical deliverables.

01AVAILABLEYOU RECEIVEDRAWING SET

CAD & DRAWINGS

Technical drawing support for utility-scale solar construction and project execution.

  • PV Layout Support
  • Cable Routing
  • Trench Layout
  • As-Built Drawings
  • Drawing Review
REQUEST CAD SUPPORT →
02AVAILABLEYOU RECEIVECALCULATION PACKAGE

PV DESIGN & ELECTRICAL STUDIES

Practical photovoltaic design and electrical engineering support informed by field construction experience.

  • String Design
  • Cable Sizing
  • Voltage Drop
  • SLD Support
  • Earthing
REQUEST ELECTRICAL SUPPORT →
03AVAILABLEYOU RECEIVEPROJECT CONTROL PACKAGE

PROJECT SCHEDULING

Construction scheduling and execution planning for utility-scale renewable-energy projects.

  • MS Project Schedule
  • WBS
  • Critical Path Review
  • Milestone Planning
  • Construction Forecast
REQUEST PROJECT SCHEDULE →
MORE ABOUT THE ENGINEERING DESK ↗

06 / DIGITAL LIBRARY

TECHNICAL
PUBLICATIONS.

Field-tested engineering knowledge, structured as practical publications and downloadable technical resources.

07 / THE PERSON BEHIND THE PROJECTS

TECHNICAL
BY TRAINING.
PRACTICAL BY NATURE.

Every project, tool and system on this page traces back to the same starting point — a technician on site, in 2007.

Portrait of Theodoros Maleas
Theodoros MaleasSolar Construction & Technical Management Professional

Theodoros started in the field in 2007 — as an electrician, then foreman — before moving into construction engineering on utility-scale solar projects in Kazakhstan, Puerto Rico, Denmark and Brazil. That experience carried into construction management, site management and technical advisory back in Greece — QA/QC, technical documentation and project delivery across international solar projects. Today, that field experience increasingly connects with digitalisation, project controls and power management — bringing construction knowledge and technology into the same workflow. Seven countries, one continuous discipline: get it right in the field first.

Good project delivery begins with understanding what actually happens in the field.
IN THE FIELD SINCE
2007
COUNTRIES WORKED
7
DISCIPLINE
Electrical Engineering
BASED IN
Greece
EDUCATIONB.Eng, Electrical Engineering — TEI of Thessaloniki (now International Hellenic University), 2007
DOWNLOAD PROFESSIONAL CVPDF · CAREER RECORD & PROJECT EXPERIENCE